Exuperius Pickering and the Llantysilio Chain Bridge

Exuperius Pickering

 

The Chain Bridge was first built in 1817 in order to link two major transport routes in North Wales, the Llangollen canal and the London to Holyhead Road. Local entrepreneur, Exuperius Pickering, wished to take advantage of the Llangollen Canal to transport his goods of coal, lime and iron bar to Telfords’ highway, thereby giving him quick and cheap access to the markets in the north. To achieve this he spent considerable time from 1814 onwards petitioning the Llangollen Canal Company to improve the feeder section of canal and allow him exclusive access to the wharves and bridges. Ultimately, the construction of the bridge allowed him to monopolise the coal trade in the area.

Pickering’s bridge and the French industrial spy

Pickering’s bridge was constructed of wooden decking supported by wrought iron chains from below and with a covering surface of earth and stone. Six oak pillars supported the bridge from within the river bed, substantial enough to withstand heavy floodwaters. Detailed survey drawings of this bridge were carried out by the French Industrial spy, J. Dutens, in 1819 accompanied by a report that included ‘one cannot assign a limit to the genius… there exist in London examples of chain bridges, but the conception of the bridge of the Dee is preferable’. By 1870 however the condition of the bridge was considered to be beyond repair and the structure removed. It was replaced in 1876 by Henry Robertson, a renowned bridge and railway engineer, as well as an owner of the Brymbo Ironworks. His design is known to have closely followed that of the first structure, the supporting pillars being of iron rather than oak. 

Other bridges & restoration

On 16 February 1928, severe flooding washed away the majority of the bridge, although the supporting chains held fast. Sir Henry Robertson, the previous Henry’s son, decided to rebuild the crossing along the lines of the Menai Suspension Bridge, reportedly re-using the chains from the original structure. Six of these chains were suspended to support the deck from above, while a further two again lay underneath the deck. The new design was a great improvement, being of greater strength and unaffected by floods.  The total cost was £303.11.00, and the official opening was marked by a day of celebrations, including the standing of 45 employees on the bridge in order to demonstrate its strength.

This bridge was finally closed in the mid 1980s and, being in a dangerous state of repair, is inaccessible. The design and scale of the chains used in the third structure are so similar as to lend considerable weight to the hypothesis that the chains from the original structure were stored and reused 111 years later.

For information about the restoration of the chain bridge see:

http://www.chainbridgehotel.com/Restoration_of_the_Chain_Bridge